Prepared Concrete
Diamond grinding creates the surface profile needed for mechanical adhesion.

Flooring system · Toronto & GTA
A seamless resin floor combining mechanical concrete preparation, a performance-selected base coat, full vinyl-flake broadcast and a durable clear topcoat.
Decorative performance
Decorative vinyl flakes are broadcast until the wet base coat can accept no more material. This full-broadcast method creates consistent coverage, texture and a multi-colour finish that helps disguise everyday dust and minor visual variation.
The base coat is selected around the concrete and exposure. A clear polyaspartic topcoat seals the flakes and provides the cleanable wearing surface.
System build
Diamond grinding creates the surface profile needed for mechanical adhesion.
Polyaspartic, epoxy or MVB is specified around slab and site conditions.
Vinyl flakes are broadcast to full rejection, then scraped and detailed.
A durable clear polyaspartic coat seals the finish and supports routine cleaning.
Where it works
System thickness, base coat and texture change with the application.
Durable, UV-stable topcoat and textured decorative finish for vehicle and household use.
Seamless, easy-care finish with moisture conditions reviewed before installation.
Exterior-compatible build selected for UV, moisture, traction and freeze–thaw exposure.
Decorative performance for customer-facing or back-of-house areas with suitable traffic.
Installation
Review the slab, coating, moisture risk, cracks, slope and access.
Mechanically prepare concrete and remove weak or incompatible material.
Treat practical cracks and defects; moving or structural cracks may return.
Install the selected base and broadcast flakes to full rejection.
Remove excess flakes, scrape the texture and vacuum thoroughly.
Seal the system and provide project-specific return-to-use instructions.
What to expect
Simple projects may be faster; removal, repairs, MVB and complex detailing add time.
Exact timing depends on product, temperature and the written project instructions.
Garages commonly require 5–7 days before parking; other spaces vary by use.
Floor coating follows the existing slab and does not correct structural movement, level, slope or drainage design.
Full flake estimate
Send clear photos, approximate area, city, intended use and any known coating, adhesive, cracks or moisture concerns.
416-720-5724
sapphirehomeupgrades@gmail.com